Improved Relationship and Critical Pathway Tools
Provide tools for users to easily identify and follow driving logic and uncover driving pathways.
26
Insight 3.0
A new version of Insight that combines simple relational tables, customisable dashboards (at project and organisation level)
19
Show float and driving tasks in Relationships
Allow users to see floating and driving tasks when viewing their related tasks.
18
Support External Map Layer Structure and Filtering
Allow users connecting external map sources (ArcGIS, WMTS, Propeller) with many sublayers to manage these by filtering at the configuration step and structuring within the viewport.
18
Improved Lag Visibility
Make it easier to see where link lag exists across the Gantt
10
Planned
Cycles: Schedule publications and daily routines
Allow users to setup their project routines to run on autopilot across daily and weekly cycles
39
View Multiple Weeks on Board View
Allow users to view multiple weeks on the Board View
33
Support restricted Member Access
Create a Viewer or Member (restricted) role that allows projects to share some or all of their plan with wider teams or plan in a restricted sandbox.
30
New Clashes Workflows
Make it easier and faster for users to review and clear multiple clashes
30
Daily Briefings and Map Markup
Allow users to markup their maps and plans with added context, publish and store them as official daily briefings or traffic management plans
30
Production Rate Planning
Make it easier for users to understand the production rates they are assuming in their plans, track those against targets and adjust accordingly
30
Gantt and Printing Gridline Settings
Allow users to configure where gridlines appear on the Gantt and in printouts.
27
Map View QoL Updates
A collection of minor Map View updates to improve quality of life such as revealing other work areas on hover
26
High Contrast Mode
Enable users to turn on a high contrast mode to optimise user experience based on individual preferences and improve visibility across various devices and monitors
25
Expand Gantt Date range options
Support broader rolling date ranges for Gantt such as "X day lookahead"
17
Baseline Variance Property
Column that calculates slippage against the baseline that is set.
15
Adjustable Grouping Columns on the Board
Allow users to adjust the width of grouping columns on the board to better fit contents.
9
Improved API scoping controls Part 1
Allow teams to create API tokens with defined scope and expiry periods .e.g. for whole Organisation or specific projects etc.
7
Support export to XML, XER, PP and MPP
Allow users to export tasks in native formats for tools like Synchro
7
Portfolios or Scheme Feature
Allow users to group projects into Portfolios and Schemes to manage large accounts easier.
6
Expand Grouping controls on Board and Gantt view
Allow an additional level of subgrouping on board view and collapsing of groups.
4
"Detail mode" for map page
Show deeper technical detail on map such as coordinates and distances on the cursor
4
Daily Statusing Compliance on Board and List View
Enable teams to see daily statusing cycle performance on board and list views.
4
Custom Week Start property on Board View
Allow users to define the "week starting on" for their view (i.e. Monday, Saturday or Sunday)
4
Latest Comment Property
Allow users to show recent comments/activity as a property on cards (e.g. Board)
4
Resizeable or Wider Dropdown Trays
Allow users to resize their dropdown trays (subcontractors, reasons etc)
3
Support wider character visibility on notes in Board Views
Allow visible notes on Board views to support a larger range of characters to the text isn't cut off so agressively.
2
Multiple Days on List View
Enable users to view multiple days side by side on list view.
1
Diary Recap
0
Backlog
Hourly/Possession/Occupation Planning
Allow users to plan discrete sections of their project down to the hour or 15min block of time.
105
Track % Complete
Allow users to track the % complete on tasks.
48
Expand "Colour By" options for views
Support broader colour by options such as Package and Folder.
32
Show daily resource demand and caps on Gantt and Board Views
Allow users to see the daily resource demand and capacity
26
Improve Progress Update to Status interaction
Allow progress updates to prompt other updates such as changes to Task Status.
21
Link Column
Support the visibility and creation of Task relationships in a gantt column
18
2️⃣
Master Schedule Variance and Update Tool
Allow users to generate a report to compare Aphex against their various master schedule versions to simplify updates.
17
3D Model Viewer for Locations
Add support for a Location type of 3D model to support models and connections to external model services
16
Allow Custom Task Ordering and Sorting
In addition to default sorting by "Start Date", allow users to set a sort by or custom order.
15
Duplicate Calendars
Allow users to duplicate existing calendars as the base for a new calendar.
14
Simplifying Team Ownership of Planning and Tasks
Allow users to easily collaborate on the development of plans and share ownership more simply than by existing controls of Delegates or Assignees.
14
Resource Capacity Caps
Allow users to set capacity thresholds for various resources to trigger alerts and warnings when they are exceeded.
14
Set gantt working day shading calendar
Allow users to set the gantt working day shading based on any project calendar (View setting)
14
Support Daily Labour and Plant assignment
Allow users to modify the daily demand of labour or plant assigned to a task as opposed to the flat distribution currently implied.
13
Automated email distribution of Published Versions
Allow teams to select to automatically distribute a pdf of published versions to their teams.
12
Allow Projects to control "Categories" of their assets
Allow custom control of plant, material and Blocker categories.
12
Add "delay all" to the Multi-select menu
Allow users to delay a range of selected tasks by the same impact and reason.
12
Daily Notes
Allow users to record notes or other logistics data attached to a day rather than a task. This could include things like deliveries, permits or other notes that would sit alongside tasks in a daily briefing.
12
Support importing of Labour, Plant, Materials
Allow imported tasks to include assigned labour, plant and materials assignments.
11
Support capturing Actual Labour, Plant and Materials
Allow users to track and report on actual labour and plant via Planner and Diary
11
Organisation level resource management
Allow companies to manage libraries of resources that can be used by projects.
11
Dark Mode of Planner Webapp
Support a dark mode/theme for the core web app of Planner.
9
Support for Aphex on Tablets
Support the creation of webclips for iOS or native applications on tablet.
9
Support "Import and Update" Workflow
Allow users to import or sync imported schedule data to update existing imported tasks.
9
Reorder-able Gantt Columns
Allow users to reorder the columns of the gantt as part of their view configuration
9
Support "Task Criticality" as a meta-property
Track the criticality of a task relative to given milestones and support using that as a filter or visual indicator on the plan.
9
Show Week Numbers in Views
Allow users to enable the visibility of Week Numbers in their timelines.
8
Support Image/PDF/DWG Upload and Replacement to Drawing and Map Locations
Allow users to upload, position, crop and style drawings and files in real world maps and cascade the same function to Drawing locations to allow drawing updates and replacements.
8
Improve planning via keyboard
8
Allow blockers to be used as a issue management tool
Allow users to assign the person responsible for resolving a blocker, external links, statuses
7
Show or hide Clashes on Gantt Views
Allow users to select whether they want to show or hide clashing warnings on gantt views
7
Support a Last Edited Property
Track a last edited property for each task that could be used as a column or other task property.
7
Expand "Group by" options for Views
Allow a broader set of grouping options including Tag, Resources and Team.
7
"Dashboard" style View
Allow projects to create a configurable "dashboard" style view
7
Add Cost Code property
Introduce a new project asset and property for tracking Cost Codes.
7
Add a Cost Forecasting Property
Allow users to assign forecast costs against tasks to generate forecast spend profiles.
7
Customisable Shifts
Allow users to create and manage the asset of Shifts such that they can create new shift types and edit their properties such as working hours.
7
Quick Filter from Resource Overlay
Allow users to quickly highlight or filter to tasks based on a resource inside the overlay.
7
Show Task Names on Gantt
Allow users to optionally show the task names against the bars on the gantt.
6
Copy Assets Between Projects
Allow users to copy assets (e.g. calendars, subcontractors etc) between projects to drive consistency and speed project setup
6
Projector View (aka Sharing Mode)
Allow users to use an optimised view for presenting on one or more TVs. Including removing headers and potentially linking across views
6
Wrap text on Gantt rows
6
Production Tracking
Support tracking of actual production across Diary and Planner to generate production reports and S curves.
6
Support "Roll-Up" of Folders in Gantt Views
Allow users to roll-up tasks within folders to a defined folder level similar to the Board view
5
Allow All Future Calendar Exceptions on Import
Allow users to import calendar exceptions beyond the current 1 year limit.
5
Advanced Sharing Tools for Published Versions
Allow users to control and track viewers of published versions, set auto-expiry of links and limit sharing permissions across projects
5
Capture Actual Labour Plant and Materials in Diary
4
Expanded Zoom (again)
Allow users to zoom out even further than a year.
4
Support Custom Automation Rules
Allow users to define rules to calculate specific task properties based on changes to other task properties. i.e. Where we assign Concrete, set the subbie to Concrete Finishers.
4
Include additional properties in PDF footer (View title, document ID)
Allow users to increasingly customise the PDF footers
4
Row ID Visibility
Allow users to enable an arbitrary ID visibility on gantt and gantt printouts to make it either for users to locate specific tasks.
4
Support predefined "Zones" on mapping tools
3
Export Daily Delays including comments and photos
3
Support Search by Category in Dropdowns
Allow users to search by category (e.g. Plant Category) in dropdowns
2
Plan API Requests
Submit your feature requests for the Plan API here such as new fields.
2
Resource scheduling and Level of Effort
Support tasks flexing duration to resource level.
2
Split Views
Allow users to get more map context on board or gantt
2
Allow users to hide Folder Codes and set them as optional
2
Capture Issues (Safety, Quality, Environment etc) in the Diary creation flow
2
Sub-Sub-Tasks
Support sub-sub-tasks
2
Grid/Table Style View
A table or grid style view in Planner
1
Identify Baseline Title on PDF printouts
1
Filter to Missing Progress Update
Allow users to filter tasks in views to identify where tasks have not been statused.
1
Quickly colour all Folders of same level
Allow Admins to quick apply consistent colouring to folders.
1
Folder and Cycle Time Reporting
Allow users to uncover insight into past and future folder durations to measure cycle times.
1
Editing Task Properties from Folders
Allow users to make bulk task edits from the parent folder.
1
Export Calendars
Allow users to export calendars.
1
Organisation User & Billing Summaries
1
Dynamic Latest Publication Link
1
Folders Management Page Improvements
1
Adding additional properties to Task Cards (Setting)
Allow teams to add more detail to task cards to help disambiguate them across the platform
1
External Mapping Layers: Interaction on Map
Allow users to interact with map layers.
1
Link from Organisation Admin to Project Settings
Allow users to jump quickly to a project from the product listing on the admin console
1
Add users to multiple projects
1
Project Permissions: Resources
Allow increased granularity for creation and management of project resources
1
Support Map Rotation of Drawing Location Types
1
Show/Hide Task Names on Map Print
Add a printing setting to show or hide the task names on the map.
1
Improve Drag and Drop Behaviour in Gantt
1
Export Diary Entry Data to CSV
1
Playthrough of Staging Diagrams
Allow users to automatically play through sequences.
1
Copy Tasks between Organisations
Allow projects to transfer work between projects in different organisations.
1
Planner Right Hand Panels to be Available on All Views
1
Map Layer Tags
Allow Map layers to be tagged by types for grouping and organisation
1
Search Project Assets by Category
When assigning assets (Plant, Labour etc) allow searching by category.
1
Support Archiving of Folders
Allow users to achive folders in their projects.
1
Allow Differential Subtask Ownership
Allow subtasks to be owned by different users within a parent.
1
Support Multiple Works Areas per Task
1
Support Show/Hide Milestone Targets in View Options
1
PDF Printout and Title Block Requests
1
Add start/end, before/after task filter
1
Show related tasks
Allow users to visualise tasks linked to filtered tasks in Map and drawing modals.
1
Completed
Published Plan (Power BI) API Improvements
Collection of suggestions and requests for improvement in the next version of the API.
23
Folder Creation Quality of Life Improvements
Allow users to duplicate, add into, quick add folders into the existing folder tree more simply.
12
Support Web Maps and contained styling from AGOL and ArcGIS Enterprise
Allow users to connect web maps from their ESRI environments along with styling applied at the Web map level.
9
Add tags to APIs
9