Project Permissions for Master Schedule Import
Members can now be granted a specific permission to perform imports regardless of their Planner Access level
Permission settings managed through the new User Panel and Table or applied in bulk from the Users Table
The additional permission is indicated by a permissions icon within the User Table
Filters
Folder filters were incorrectly hiding non-matching folders when filtering by Folder and other properties
All Select Filter dropdowns were opening when the filter modal was closed and reopened
Gantt
Task bars were disappearing when dragging tasks offscreen
Lag was not syncing after automatic scheduling, causing links to stop driving tasks
Maps
WMTS upload was failing when GetCapabilities returned a single <Layer>
Aerial imagery ordering was reversed for Propeller and Civillo sources
Task card preview popover was appearing behind the left panel instead of respecting the viewport boundary
Importing
Folder order in Board view was different from the Folders assets page
Copying tasks to another project was failing when externalId was missing
Folder import via copy/paste was truncating Folder codes
Printing the same view twice was producing differently ordered PDF outputs
Top row dates and task arrows were disappearing when scrolling with Multiple Columns enabled
Right click was incorrectly enabled on the Latest Comment property in Gantt cells
Dropdown from overflow menu was closing immediately when flipping to the left
Spotlight task popup card spacing and corner radius were not matching design
Dropdowns in RHP > Overflow menu were not showing expected width on load
Text in layers pulled from Civillo was not resizing when zooming out
Diary
Weather image was not showing on diary entries
Organisation logo was appearing instead of project logo on diary entry exports
Authentication
Signing up without an organisation membership was returning a 500 error
MFA status was not appearing in the Admin authentication column